验货员论坛

 找回密码
 注册
搜索
查看: 3185|回复: 16
打印 上一主题 下一主题

我自己写的QC report model-法国人很喜欢的模板

[复制链接]
跳转到指定楼层
1#
发表于 2010-1-12 10:51:47 | 只看该作者 回帖奖励 |正序浏览 |阅读模式
本人毕业一年半,做过一年业务,现在到法国贸易公司上海办事处半年了,一直从事验货工作。由于我们的产品都是手工制品,验货需要很细致的检验,我就自己构思写了一个验货报告模板,主要是罗列出各种问题并指出问题严重程度,每个点都附有照片说明,法国那边看了每次都说很详细具体~~大家看了提提意见~~
PS:系统默认要收金币的,不是我~~

Item:



The name is the item for inspection.
Inspection Sample:

There are two choices: 1) Samples in mass production, say, when the inspector(s) go(es) out for inspection, the production is still in procedure; 2) the final production, say, all the products are ready for shipping.
Time:

The date of inspection.
Factory:

Factory name-Place. For example, “Nanya Knitting-Tongzhou”.
Inspector:
The person(s) goes(go) out for inspection.

1. Survey of this Order

The brief words explain the main aspects of the order for inspection. For example, the quantity of this order, the different sizes and colors of the products and so on.

2. Brief Introduction of Inspection
The brief words explain the main procedures of the inspection. For example, how many cartons are opened during the inspection and how is the inspection carried out.

3. Main Inspection Points
This section shows the readers what are the most important aspects need to be noticed during the inspection.
For example, “1/ the appearance and workmanship of the sweaters-refer to Part C.1, Part D.1, and Part E.1Appearance” and “workmanship” are important aspects. “Refer to Part C.1, Part D.1, Part E.1“means you may find the related inspection results in the below five parts which are the main passages of this report.

Part A. Good Aspects
Obviously, this part shows the readers what aspects are well done by our factory.

Part B. Accepted Doubtful Points

These points are that the defects found during inspection, but accepted by the customer later. Maybe, as not only being accepted this time, but also for the future, these defects will not do harm to the sales and the usage of the product.

Some times, it writes “
PS:…”, for example, “PS: Joy had asked the factory to check all the sweaters and cut the thrum”. It means that what the actions to solve these problems asked by inspectors to the factory to take.

Part C. Pending Defects
These pending defects are accepted by the customer only for this very order, but they must be avoided next time.
Sometimes, customer accepts these defects because of the time limitation for shipping or something, while these defects will not do much harm to the sales and the usage of the product.

Part D. Main Problems
These main problems must be solved before re-packing this time before shipping. Otherwise, the customer will not accept and the shipping will be delayed accordingly till the factory takes good actions to solve these problems.

Part E. Other Pictures
Generally, these pictures show other aspects of the product.

inspection report model.doc

39 KB, 下载次数: 143, 下载积分: 金币 -1

评分

参与人数 1威望 +2 收起 理由
angel520 + 2 原创内容,支持!

查看全部评分

17#
发表于 2017-5-17 12:39:47 | 只看该作者
问下,没有中文翻译吗
16#
发表于 2017-1-9 22:07:55 来自手机 | 只看该作者
好神奇
15#
发表于 2015-6-6 19:49:26 | 只看该作者
常用塑料名称、性能、用途、成型特性
14#
发表于 2015-5-5 19:35:58 | 只看该作者
路过
13#
发表于 2015-5-5 16:18:11 | 只看该作者
感謝分享,好東西
12#
发表于 2014-9-17 07:58:57 来自手机 | 只看该作者
谢谢分享!
11#
发表于 2010-1-19 13:45:59 | 只看该作者
Rubbish-------CAN YOU SHARE GOOD INFORMATIONS ?
10#
发表于 2010-1-19 12:58:49 | 只看该作者
赞一个。。
唉。。可惜拿不到啊
9#
发表于 2010-1-19 09:34:49 | 只看该作者
看起来很乱,很杂,没有一个系统的思路,只能说是新手,最好整成EXCEL表格形式,清晰明了
您需要登录后才可以回帖 登录 | 注册

本版积分规则

小黑屋|手机版|Archiver|外贸验货员网

GMT+8, 2025-6-17 20:23 , Processed in 0.051067 second(s), 26 queries , Gzip On.

Powered by Discuz! X3.2

© 2001-2013 Comsenz Inc.

快速回复 返回顶部 返回列表