AS/NZS 3120中Current breaking test要求不甚明白:
...
(a) A plug shall be inserted in the socket with no current flowing.
(b) Immediately following each full insertion, a current as prescribed in Items (i) and
(ii) shall be passed through a circuit including the plug and socket for 15 s.
(c) The plug shall be then withdrawn from the socket under load at a rate of
approximately 150 mm/s, and shall remain withdrawn for approximately 105 s.
...
另外,以下这句话是不是表示,如果产品带接地,要求接地也通电流!Where an earthing contact and an earthing pin are included, the earthing terminal of the socket shall be connected to the neutral terminal during the test.