| 
 | 
O      All items (except porcelain doll) require Lab Testing at vendor 
> expense and must obtain favorable testing results before shipment can occur. 
> When required, the lab test is done once per season for each item.           所有由供應商付費要求進行實驗室測試的items(陶瓷娃娃除外), 
  一定要在出貨前拿到測試結果. 若要求測試, 每個item每季做一次測試. 
> 
> O      Factories used in the manufacturing of the Dollar General product 
> will be evaluated at the expense of Dollar General. There are nine critical 
> points, which will result in immediate audit failure. Select a factory 
> that can meet the following: 針對DG大貨產生工廠, 由DG付費進行評估. 
   有9點很重要, 會直接影響驗廠失敗. 要選擇符合以下條件的工廠: 
> 
>   1.. Factory is compliant with Dollar General’s Child Labor Policy. 
> (The minimum age for employment is 16 years of age.) 
      工廠需要遵守Dollar General的童工政策.(雇員最小年齡是16歲) 
>   2.. A review of factory documentation confirms there is no evidence of 
> forced or involuntary labor, whether in the form of prison, bonded, 
> indentured or otherwise. 審看工廠資料, 確認沒有強迫或非自愿的勞工 
    的証據, 不論是否以監禁, 擔保, 合同或其他形式. 
>   3.. Factory is compliant as required by the applicable country laws 
> concerning regular and overtime pay rates. 
     工廠要遵守有關普通和加班付薪的相關的國家法律規定. 
>   4.. Factory workers are given at least one-day rest per 7-day period. 
       工廠工人每7天到少要有一天的休息時間. 
>   5.. Factory follows the legal limit on number of annual overtime hours worked. 
      工廠要遵守法定的全年加班時間限定. 
>   6.. There are sufficient exits for an emergency and doors are opened 
> and/or unlocked during working hours. - At least two exits on each floor 
>    工作時間, 要有足夠的出口, 門要打開或者不要鎖住, 防止突發事件, 
>     每層樓至少要有2個出口. 
>   7.. Factory has adequate fire extinguishers on site. 
      工廠要有足夠的滅火器. 
>   8.. Factory does not engage in trans-shipping activities. 
      工廠不要參與中轉活動. 
>   9.. If applicable, the factory has a needle replacement policy in effect. 
      若可以, 工廠需要實行換針規定. 
> O      Two types of Inspections are required for each Purchase Order at the 
> expense of Dollar General. 每次下的訂單由DG付費進行兩次檢貨. 
> 
> o       During Production Inspection – requires 10% packed products 
> (applies to lab test required order only).  
      產品檢貨期間, 要求10%的產品完成包裝(只針對實驗室要求的訂單) 
> 
> o       Final Random Inspection – requires 80% packed products. 
        最終的隨機檢貨--要求80%的產品完成包裝. |   
 
评分
- 
查看全部评分
 
 
 
 
 
 |