TS16949中英文对照--产品实现
7 Product realization产品实现
7.1 Planning of product realization产品实现的策划
The organization shall plan and develop the processes needed for product realization. Planning of product realization shall be consistent with the requirements of the other processes of the quality management system (see 4.1).
组织应策划和开发产品实现所需的过程。产品实现的策划应与质量管理体系其他过程的要求相一致(见4.1)。
In planning product realization, the organization shall determine the following, as appropriate:
在对产品实现进行策划时,组织应确定以下方面的适当内容:
a)
quality objectives and requirements for the product;
a)产品的质量目标和要求;
b)
the need to establish processes, documents, and provide resources specific to the product;
b)针对产品确定过程、文件和资源的需求;
c)
required verification, validation, monitoring, inspection and test activities specific to the product and the criteria for product acceptance;
c)产品所要求的验证、确认、监视、检验和试验活动,以及产品接收准则;
d)
records needed to provide evidence that the realization processes and resulting product meet requirements (see 4.2.4).
d)为实现过程及其产品满足要求提供证据所需的记录(见4.2.4)。
The output of this planning shall be in a form suitable for the organization's method of operations.
策划的输出形式应适合于组织的运作方式。
NOTE 1
A document specifying the processes of the quality management system (including the product realization processes) and the resources to be applied to a specific product, project or contract, can be referred to as a quality plan.
注1:对应用于特定产品、项目或合同的质量管理体系的过程(包括产品实现过程)和资源作出规定的文件可称之为质量计划。
NOTE 2
The organization may also apply the requirements given in 7.3 to the development of product realization processes.
注2:组织也可将7.3的要求应用于产品实现过程的开发。
NOTE
Some customers refer to project management or advanced product quality planning as a means to achieve product realization. Advanced product quality planning embodies the concepts of error prevention and continual improvement as contrasted with error detection and is based on a multidisciplinary approach.
注:有些顾客将项目管理或产品质量先期策划作为一种产品实现的方法。产品质量先明策划包含着防错和持续改进的概念,与找出错误不同,而且是基于多方论证的方法。
7.1.1 Planning of product realization - Supplemental产品实现的策划-补充
Customer requirements and references to its technical specifications shall be included in the planning of product realization as a component of the quality plan.
作为质量计划的一部分,产品实现的策划应包括顾客要求和对其技术规范引用。
7.1.2 Acceptance criteria接收准则
Acceptance criteria shall be defined by the organization and, where required, approved by the customer.
组织应规定接收准则,要求时,由顾客批准。
For attribute data sampling, acceptance criteria shall be zero defects (see 8.2.3.1).
对于计数型数据抽样,接收水平应是零缺陷(见8.2.3.1)。
7.1.3 Confidentiality保密
The organization shall ensure the confidentiality of customer‑contracted products and projects under development, and related product information.
组织应确保顾客委托的正在开发的产品、项目和有关产品信息的保密。
7.1.4 Change control更改控制
The organization shall have a process to control and react to changes that impact product realization. The effects of any change, including those changes caused by any supplier, shall be assessed, and verification and validation activities shall be defined, to ensure compliance with customer requirements. Changes shall be validated before implementation.
组织应有一个对影响产品实现的更改进行控制并作出反应的过程。任何更改的影响,包括由任何供方引起的更改,都应进行评估,且应规定验证和确认的活动,以确保与顾客要求相一致。更改在实施前应予以确认。
For proprietary designs, impact on form, fit and function (including performance, and/or durability) shall be reviewed with the customer so that all effects can be properly evaluated.
对有专有权的设计,对外形、配合、功能(包括性能和/或耐久性)的影响应与顾客共同进行评审,以便所有的影响都能得到适当的评价。
When required by the customer, additional verification/identification requirements, such as those required for new product introduction, shall be met.
当顾客要求时,还应满足附加的验证/标识要求,如对新产品引入的那些要求。
NOTE 1
Any product realization change affecting customer requirements requires notification to, and agreement from, the customer.
注1:任何影响顾客要求的产品实现的更改都要通知顾客,并征得顾客同意。
NOTE 2
The above requirement applies to product and manufacturing process changes.
注2:以上要求适用于产品和制造过程更改。 |
|