Temperature shock test chamber

[复制链接]
跳转到指定楼层
1#
发表于 2011-7-1 14:39:28 | 只看该作者 回帖奖励 |倒序浏览 |阅读模式
Purpose

This product is applicable for the safe performance test of electronic components and parts and provides the reliable test and product selection test etc; through the chamber test,(linpin) the product reliability can be improved and the quality control can be conducted.
Chamber Structure

All functions adopt the computer control with good operation interface so as to ensure the user’s operation and monitoring is more simple and straightforward(linpin).
The cold chamber and hot chamber are c
ontrolled independently and the chamber doors are independent of each other so as to enlarge the use range of the test chamber (1 chamber for 3 purposes)(linpin).
A standard lead hole pipe is in
stalled on the top of the chamber in order to facilitate users to lead sensor cable,(linpin) inspection cable etc into the chamber.
Control System

The switching time between low temperature zone and high temperature zone is not more than 15sec.
The temperature recovery time is not more than 5min.
Standards Applied

GB/T2423.1.2, GB10592-89, GJB150
Specs & Technical Parameters

Model (CM)
WDCJ-162
WDCJ-340
WDCJ-500
WDCJ-010
Workroom Dimensions
45*45*45
60*60*60
80*80*80
100*100*100
Exterior Dimensions
156*87*154.5
171*102*184.5
191*122*226.5
211*142*266.5
Sample Zone Dimensions
30*30*25
45*45*36
65*65*50
85*85*70
Power

6.5(KW)
8.6(KW)

13.5(KW)
15.5KW
Performance Index
Temperature Range
A:-20℃~200℃ B:-40℃~200℃ C:-60℃~200℃
Temperature Fluctuation
≤±2℃ for high temperature and low temperature
Temperature Fluctuation
≤±0.5℃(Under constant temperauture)
Sample Zone Load
20kg
30kg
50kg
60kg
2#
发表于 2011-7-1 15:28:22 | 只看该作者
真心想分享的话,就发个中文版的,你当人人都是专家啊
您需要登录后才可以回帖 登录 | 注册

本版积分规则

小黑屋|手机版|Archiver|外贸验货员网

GMT+8, 2025-6-23 03:28 , Processed in 0.046894 second(s), 18 queries , Gzip On.

Powered by Discuz! X3.2

© 2001-2013 Comsenz Inc.

快速回复 返回顶部 返回列表