Document (s) | SL | SH | HG | |
| ISO Certification | | x | x | x |
| Formal documented system to control document revision, distribution and maintenance | | x | x | x |
| Documented system to define storage, protection and retention of quality records | | x | x | x |
| Documented Production procedures/instructions for all processes | | x | x | x |
| Documented Inspection procedures/instructions for all stages of production | | x | x | x |
| Documented pre-production meeting process | | x | x | x |
| Pre-production meeting records | | x | x | x |
| Documented Pilot/Test Run process | | x | x | x |
| Documented Pilot/Test Run results | | x | x | x |
| Documented factory delivery performance records | | x | x | x |
| Documented preventative maintenance process for all factory equipment | | x | x | x |
| 欢迎光临 验货员论坛 (http://bbs.wtoqc.net/) | Powered by Discuz! X3.2 |