Carton drop test |
Barcode check |
Assembling |
Riding bicycle at least 2 kilometers each item |
Checking the welding point and solidity |
Assembly |
Inflate tire at determined pressure at least 4 hours to check if leakage |
Net weight of bicycle |
Brake ability: dry/wet condition, block, holder |
reflector ability |
Measurement checking |
all over size after assembled |
diameter of tub |
Inner & outer diameter of wheel |
height of seat ( Max. and Min) |
distance between centers of wheels |
length of top tub |
Inspection Criteria - LCD Monitors.doc
194 KB, 下载次数: 76, 下载积分: 金币 -1
LCD TV/Monitor Inspection checklist
欢迎光临 验货员论坛 (http://bbs.wtoqc.net/) | Powered by Discuz! X3.2 |